MI0033 – SOFTWARE ENGINEERING

Dear students get fully solved  SMU MBA assignments

Send your semester & Specialization name to our mail id :

 

“ help.mbaassignments@gmail.com ”

or

Call us at : 08263069601

 

 

ASSIGNMENT

 

DRIVE WINTER 2014
PROGRAM MBADS (SEM 3/SEM 5)MBAFLEX/ MBA (SEM 3)

PGDISMN (SEM 1)

SUBJECT CODE & NAME MI0033 – SOFTWARE ENGINEERING
BK ID B1965
CREDITS 4
MARKS 60

 

 

Note: Answer all questions. Kindly note that answers for 10 marks questions should be approximately of 400 words. Each question is followed by evaluation scheme.

 

  1. 1. Explain the concept of “software project life cycle” with a suitable example.

 

Answer:There are various software development approaches defined and designed which are used/employed during development process of software, these approaches are also referred as “Software Development Process Models” (e.g. Waterfall model, incremental model, V-model, iterative model, etc.). Each process model follows a particular life cycle in order to ensure success in process of software development.

 

Software life cycle models describe phases of the software cycle and the order in which those phases are executed. Each phase produces deliverables required by the next phase in the life cycle. Requirements are translated into design. Code is produced according to the design which is called development phase. After coding and

 

  1. 2. Describe the different software estimation techniques and models used for estimating a software project.

 

Answer:Practitioners have expressed concern over their inability to estimate accurately costs associated with software development. This concern has become even more pressing as cost associated development continue to increase. Considerable studies are now directed at constructing ,evaluating and selecting better software cost estimation models and tools for specific software development projects. This essay gives an overview of cost estimation models and then discusses their advantages and disadvantages. Finally, the guidelines for selecting appropriate cost estimation models are given and a combination method is recommended.

 

 

 


  1. 3. Describe in detail the software reliability metrics and its types

 

Explaining software metrics

Explaining software reliability models

 

Answer:A software metric is a quantitative measure of a degree to which a software system or process posesses some property. Since quantitative measurements are essential in all sciences, there is a continuous effort by computer science practitioners and theoreticians to bring similar approaches to software development. The goal is obtaining objective, reproducible and quantifiable measurements, which may have numerous valuable applications in schedule and budget planning, cost estimation, quality assurance testing, software

 

 

  1. 4. Briefly note on design fundamentals and explain the principles of design

 

Answer:Design fundamentals

 

The basic structure of graphic design consists of three basic elements:

 

  • Dot
  • Line
  • Area

 

  1. Dot – is the smallest element of graphic design. Depending on a distance points of various sizes can be perceived. Designing with dots or points can create a wide variety of visual effects. There are various associations that can be made with

 

 

 

  1. 5. Explain the different types of integration testing

 

 

Answer:Software testing is an investigation conducted to provide stakeholders with information about the quality of the product or service under test. Software testing can also provide an objective, independent view of the software to allow the business to appreciate and understand the risks of software implementation. Test techniques include, but are not limited to, the process of executing a program or application with the intent of finding software bugs (errors or other defects).

 

It involves the execution of a software

 

 

  1. 6. Briefly explain the SQA plan.

 

Answer:The purpose of the software quality assurance plans (SAQP) is to specify all the work products that need to be produced during the project, activities that need to be performed for checking the quality of each of the work products, and the tools and methods that may be used for the SQA activities.

 