MARKS :80

 

 

Course : BMS (Bachelors In Management Studies)                          

 

Answer the question in one line.

 

 

 

Q1. Ahmet Uslu makes wooden boxes in which to ship motorcycles. Ahmet and his three employees invest 40 hours per day making the 120 boxes. a. What is their productivity? b. Ahmet and his employees have discussed redesigning the process to improve efficiency. If they can increase the rate to 125 per day, what would be their new productivity? c. What would be their increase in productivity? (10 marks)

 

Answer :

 

Q2. Magusa Metal Works produces cast bronze valves on an assembly line. On a recent day, 160 valves were produced during an 8-hour shift. Calculate the

productivity of the line. (10 marks)

Answer :

 

Q3. Kleen Karpet cleaned 65 rugs in April, consuming the following resources: Labour: 520 hours at 13 MU/hour Solvent: 110 litres at 5 MU/litre Machine Rental: 20 days at 50 MU/day a. What is the labour productivity? b. What is the multifactor productivity? (10 marks)

Answer :

 

 

Q4. Ilhan Dalci is president of Ilhandir Manufacturing, a producer of Go-Kart Tires. Dalci makes 1000 tires per tires per day with the following resources:

Labour: 400 hours at 12.50 MU/hr Raw Material: 20 000 kgs/day at 1MU/kg Energy: 5 000 MU/day Capital: 10 000 MU/day a. What is the labour productivity for these tires at Ilhandir Manufacturing? b. What is the multifactor productivity for these tires at Ilhandir Manufacturing? c. What is the percent change in multifactor productivity if Ilhandir can reduce energy bill by 1000 MU without cutting production or changing any other inputs? (10 marks)

Answer :

 

Q5. Describe briefly the steps to develop a forecasting system. (10 marks)

Answer :

 

Q6. Describe briefly the “Delphi Method”. (10 marks)

Answer :

 

Q7. What is production/operations? (10 marks)

Answer :

 

Q8. What factors distinguish between production and service operations?

Answer :

 

 

 

Dear students get fully solved assignments

Send your semester & Specialization name to our mail id :

 

“ help.mbaassignments@gmail.com ”

or

Call us at : 08263069601

(Prefer mailing. Call in emergency )

 

Leave a Reply