Dear students get fully solved assignments
Send your semester & Specialization name to our mail id :
help.mbaassignments@gmail.com
or
Call us at : 08263069601
NMIMS Global Access
School for Continuing Education (NGA-SCE)
Course: Project Management
Assignment Marks: 30
Instructions:
- All Questions carry equal marks.
- All Questions are compulsory
- All answers to be explained in not more than 1000 words for question 1 and 2 and for question 3 in not more than 500 words for each subsection. Use relevant examples, illustrations as far aspossible.
- All answers to be written individually. Discussion and group work is not advisable.
- Students are free to refer to any books/reference material/website/internet for attempting theirassignments, but are not allowed to copy the matter as it is from the source of reference.
- Students should write the assignment in their own words. Copying of assignments from otherstudents is not allowed.
- Students should follow the following parameter for answering the assignment questions.
For Theoretical Answer | For Numerical Answer | |||
Assessment Parameter | Weightage | Assessment Parameter | Weightage | |
Introduction | 20% | Understanding and usage of the formula | 20% | |
Concepts and Application related to the question | 60% | Procedure / Steps | 50% | |
Conclusion | 20% | Correct Answer & Interpretation | 30% |
1. You are organizing an Annual Day in your university. Explain the steps to designing a project organization structure for this case. According to you which will be the most critical steps and why?
Introduction
As defined by the International Organization for Standardization, the organizational structure combines various activities such as supervision, coordination, and allocation that aid in changing the way an organization works and achieving objectives and goals in a competitive market. Also, in this vein, an organizational structure directly influences routines, rest, and procedures required to comply with
2. India’s Road and Transport Ministry has taken up various Expressway Road Projects in the country. One of the such project consist of following parts
· Constructing roads
· Constructing tunnels
· Constructing bridges over the river
· Constructing flyovers and junctions
· Constructing convenient places (fuels stations, rest areas, etc.)
· Developing a solution for speed monitoring
· Finding suitable road material for areas in a heavy flood zone
Using thing information as example, describe various project life cycle models
Introduction
In a similar vein, the life cycle of a project refers to the amount of time it takes to complete assignments and receive the output or result of those projects. Furthermore, a project’s life cycle or total duration is defined as the in-depth analysis of project objectives. It aims to aids in the development of practical goals and objectives that can be implemented. In contrast, different projects typically take more than a year to complete and yield the maximum amount of output in the business world. On the
3. A project manager is struggling to manage the project due to risk and the cost. The details are
Original Project Budget: Rs. 40, 00,000
· Original Estimated Duration: 36 Months
· Elapsed Time: 12 Months
· Money Spent till Date: Rs. 15,00,000
· Work Completed: 40 %
· Risk Identified and Ratings
a. Suggest the risk priority to this project manager.
Introduction
Because of the costs and time constraints associated with a project, risk priorities are an essential factor in analyzing the issues and problems. On the other hand, risk factors are some elements that include probabilities of points, their impacts, and risk events. They are similar to risk factors. Furthermore, when
b. Find out the “Estimate at Completion” using all possible ways.
Introduction
There are two primary metrics in project forecasting: the estimate at completion and the assessment to complete, respectively. Similarly, the meaning of these metrics differs, with ETC indicating that the remaining work will
Dear students get fully solved assignments
Send your semester & Specialization name to our mail id :
help.mbaassignments@gmail.com
or
Call us at : 08263069601